President of Russia Dmitry Medvedev, who is on his first European visit to Germany, claimed after his meeting with German Chancellor Angele Merkel that Project Nord Stream meets the energy security interests of Europe.
"We actually regard it as a global European-scale project, which equally meets reliable-energy- provision and energy security interests of all European countries”, the Russian President said.
At the same time Dmitry Medvedev emphasized that during his talks with German Chancellor Angele Merkel they discussed not only the Nord Stream but also the South Stream. As quoted to Medvedev, “it is important that these two projects develop in time coordinated fashion”.
Let us recall that gas pipeline Nord Stream to be laid on the Baltic Sea floor will be the first pipeline to provide for direct Russian natural gas supplies to West Europe. The designed capacity of the pipeline will be 55 billion cubic meters. The first subsea gas pipeline string of 27.5 billion cubic meters will be commissioned in 2010, and the first commercial gas supplies will start in 2011.
In turn, the South Stream Project provides for construction of a new gas pipeline to Europe. Today investments in the South Stream Project total more than 10 billion Dollars. It is expected that the subsea section of the South Stream pipeline will connect the Russian coast with the Bulgarian one across the Black Sea. The total length of the Black Sea section will be 900 km and maximum depth – more than 2,000 m. The designed capacity of the pipeline will be about 30 billion cubic meters.
Speaking about the talks with the German party Medvedev pointed out that the priority item of the agenda was further development of trade and economic cooperation, RIA Novosti reports.
"We actually regard it as a global European-scale project, which equally meets reliable-energy- provision and energy security interests of all European countries”, the Russian President said.
At the same time Dmitry Medvedev emphasized that during his talks with German Chancellor Angele Merkel they discussed not only the Nord Stream but also the South Stream. As quoted to Medvedev, “it is important that these two projects develop in time coordinated fashion”.
Let us recall that gas pipeline Nord Stream to be laid on the Baltic Sea floor will be the first pipeline to provide for direct Russian natural gas supplies to West Europe. The designed capacity of the pipeline will be 55 billion cubic meters. The first subsea gas pipeline string of 27.5 billion cubic meters will be commissioned in 2010, and the first commercial gas supplies will start in 2011.
In turn, the South Stream Project provides for construction of a new gas pipeline to Europe. Today investments in the South Stream Project total more than 10 billion Dollars. It is expected that the subsea section of the South Stream pipeline will connect the Russian coast with the Bulgarian one across the Black Sea. The total length of the Black Sea section will be 900 km and maximum depth – more than 2,000 m. The designed capacity of the pipeline will be about 30 billion cubic meters.
Speaking about the talks with the German party Medvedev pointed out that the priority item of the agenda was further development of trade and economic cooperation, RIA Novosti reports.
Tags:
Also on this topic:
01.10.2026 17:41
Trump calls Iran’s potential annihilation ‘possibility’
01.10.2026 17:33
Press review: Flydubai incident raises Mid East escalation risks and US ends Iraq mission
01.10.2026 11:27
RDIF CEO says Lithuanian PM’s remarks about no threat from Russia are 'unusually wise'
30.09.2026 16:52
Press review: EU may tighten Ukraine aid oversight as US, Iran explore nuclear compromise
29.09.2026 17:19
Lavrov comments on Poland`s plans to produce Patriot missiles, preparing for talks with US
29.09.2026 17:16
Trump backs plan to ease US sanctions on Russia — media
Latest news
Themes
Comments
Comments are published after moderation.